Atmospheric solutions

Emergency Response - ExxonMobil

An emergency response project required an accelerated site assessment to identify the extent of contamination in adjacent residential and commercial properties from ruptured product pipelines. 

The assessment was completed within a 2-month time frame, although site mitigation actions were begun within the first month of the project. A feasibility study and pilot test were performed to collect and treat soil gas through a mobile soil gas extraction system. 

Scroll to Top